“Excellent service from Buddy and the team in installing a new garage roof in a really professional manner. Was kept updated at all stages and given good advice as to our options. Would highly recommend”
Peter Aspinall
Wallasey and New Brighton carry a good deal of Victorian and Edwardian seaside property alongside inter-war suburbs, with The Magazines and Wellington Road conservation areas among Wirral's twenty-six. It is a mixed picture, and the two halves of it want different things from a roof.
Roofline Solutions provides professional new roof installations in Wallasey, including complete re-roofing, replacement roofs, new slate roofs and new tiled roofs.
We would rather quote for what a roof needs than for the largest job available. Sometimes that is a complete replacement; often it is a chimney flashing and a clear gutter, and we will say so.
The older property is broadly what you would expect: slate in many cases, complicated plans, and a fair amount of junction detail per square metre. It sits in an exposed position, which pushes towards a properly calculated fixing specification and towards renewing the lead rather than re-using it.
Semis of the 1920s and 30s were very often built with hipped roofs rather than gables — four sloping planes running down to hips at the corners instead of two planes with a vertical gable wall at each end. It is a better-looking roof and it sheds wind well. It is also more expensive to cover, for reasons that have nothing to do with area.
One question worth putting to anyone quoting on a hipped roof: how are the hips being finished? The originals are bedded in mortar, and by now that mortar has done its cracking — which on a hip means tiles can slide. Mechanically fixed dry hip systems cost a little more and remove the failure mode.
The thing to compare between quotations is not the total but the scope. Three prices for the same defined piece of work tell you something. Three prices for three different pieces of work tell you only which contractor assumed the least.
Where a roof was originally slate and now carries tile, somebody changed it. That is worth knowing before a re-roof, because it means the structure was framed for something lighter, and because going back to slate is available to you at the one moment when it is comparatively straightforward.
The junctions matter more on a slate roof than the slate does. Older slated property typically carries more abutment and valley detailing than a modern tiled roof, and every one of those needs lead - which is slow, skilled and priced by weight.
Where a property is one of a pair or a terrace and the neighbouring roof is the same age, there is a real saving in doing both together - one scaffold, one site set-up, one waste run, and no awkward junction where new covering meets old.
Cracked or missing mortar at the ridge and verges, and lead that has split, lifted or been patched with mastic, are small in area and disproportionately visible. On their own they are repairs; alongside other signs they are part of a picture.
Where several things on the outside of the house are due within a few years of each other, that shifts a borderline case decisively. Doing them under one scaffold is the difference between paying for access once and paying for it three times.
The safest general rule is to go back to what the building was designed for. The structure was framed for the weight of the original covering and the pitch was set for its characteristics, so returning to it is nearly always the straightforward answer - structurally, technically and visually.
A sensible order is: survey and any permissions, scaffold up, structural work, strip and timber repairs, new covering and lead, then chimney, render and upper windows on the same scaffold, then fascias and gutters, then scaffold down - and only then the internal programme.
For a garage or outbuilding the honest advice is often that a simpler specification is enough. There is no sense putting a house-grade covering on an unheated store, and we would rather say so than sell you one.
Most people assume a new roof needs planning permission. Usually it does not, and the reason is stronger than permitted development. Under section 55 of the Town and Country Planning Act 1990 — which applies in England and Wales alike — work that does not materially affect the external appearance of a building is not development at all. A like-for-like re-roof therefore falls outside the planning system rather than relying on rights granted by the Town and Country Planning (General Permitted Development) (England) Order 2015.
A change of covering is a different question, because it may materially affect external appearance. That is where conservation area status starts to matter: even with no Article 4 direction in force, inside a conservation area the “not materially affecting external appearance” test is applied a good deal more tightly, so swapping slate for a visibly different tile can need permission on its own merits. Wirral Council can confirm the position for a specific address at no cost.
Wallasey and New Brighton contain the The Magazines and Wellington Road conservation areas.
None of Wirral's Article 4 directions that we could identify controls roof coverings in Wallasey.
If the building is listed, listed building consent is a separate requirement from planning permission and it does cover roof coverings. That should be resolved before the work is priced rather than after.
Building regulations are separate from planning, and they are the part that catches people out. Replacing a roof covering renews a thermal element, and where more than 50% of that element's surface area is renewed — or the work forms part of a major renovation — regulation 23 of the Building Regulations 2010 requires the whole element to be brought up to current thermal standards, so far as that is technically, functionally and economically feasible. A patch repair is not a re-roof and does not trigger it, and neither does a roof over unheated space such as a detached garage, an outbuilding or a carport.
For a roof in an existing dwelling, Approved Document L Volume 1 gives a U-value of 0.16 W/(m²K) for the renovated element. On an ordinary cold loft that is reached by topping up the insulation at ceiling level rather than insulating the roof slope; where the roof space is a habitable room, the insulation has to go at rafter level instead, which is a bigger job and should be priced as one.
The work is signed off in one of two ways: a notification to building control — either Wirral Council's own service or a Registered Building Control Approver — or self-certification by a roofer registered under a competent person scheme, such as NAPIT or CompetentRoofer, now run by the National Federation of Roofing Contractors as the NFRC Competent Person Scheme. Whichever route is used, you should receive a compliance certificate at the end — keep it, because a buyer's solicitor will ask for it.
Between the seaside stock and the inter-war semis there is no such thing as a typical Wallasey roof, which is why the figure follows the survey.
“Excellent service from Buddy and the team in installing a new garage roof in a really professional manner. Was kept updated at all stages and given good advice as to our options. Would highly recommend”
Peter Aspinall“Brilliant company. Did a really good job worked hard, looks really good up to my expected standards which are high. Can highly recommend them.”
Cheshire Porcelain“Very professional efficient team great communication. Would definitely recommend made the process quick and easy…”
Harry MorganFive guides written for Wallasey specifically, plus ten more in the main advice centre.
Complete new roofs, re-roofing and roof replacement across Chester, the Wirral, Deeside and the surrounding areas.
2 Manley View
Elton
Chester
CH2 4QF
Telephone: 07464 259566
WhatsApp: 0044 7464 259566
Email: Evensbuddy@yahoo.com
Tell us about the property and the roof in Wallasey, and we will come back to you — usually the same day.
Prefer to talk? Call 07464 259566 · WhatsApp 0044 7464 259566 · Email Evensbuddy@yahoo.com