Two quotations can both say “new tiled roof” and describe genuinely different standards of work. There are published requirements behind this, and several of them you can check with your own eyes.
The cost variables for a tiled re-roof are much the same everywhere: area and shape, the tile, the condition of the timbers, access, and the work that goes with it. Those are covered at the end of this guide.
The more useful thing for a homeowner is how to tell whether a quotation describes a properly specified roof or a cheap one. There are published requirements behind all of this, and — unusually — several of them you can verify yourself while the work is happening.
Slating and tiling in the UK is done to BS 5534:2014+A2:2018, the code of practice for slating and tiling for pitched roofs and vertical cladding. It covers fixings, wind-uplift resistance, underlay, battens and mortar.
Two things about its status are worth knowing. It is not law — and you will occasionally see it claimed that it sits inside Approved Document A, which it does not. What it is, is the recognised standard of workmanship: building control treat compliance as the accepted way of showing a roof meets the relevant functional requirements, and manufacturer guarantees are routinely conditional on it. A roof that does not follow it is hard to defend as workmanlike.
The A2 amendment also brought normal re-roofing work, including repairs, explicitly into the standard's scope. It applies to your job, not just to new build.
This is the part most commonly misreported, so it is worth being precise.
Mortar bedding remains permitted. What changed is that mortar no longer counts as a fixing. Ridge and hip tiles must be mechanically fixed whether or not mortar is also used. So “dry ridge is now a legal requirement” is wrong — mechanical fixing is required, and a dry-fix system to BS 8612:2018 is simply the usual way of achieving it.
| Covering | Minimum fixing requirement |
|---|---|
| Single-lap interlocking tiles | Every tile mechanically fixed, plus clips where the calculation requires |
| Double-lap plain tiles | Every fifth course twice-nailed, plus all perimeter tiles twice-fixed |
| Natural slate | Nailed or hook-fixed; headlap set by pitch, slate size and exposure |
| All perimeter tiles | Two fixings minimum |
So the blanket claim is true for the interlocking tiles on most modern roofs and false for plain tiles. There is nothing wrong with fixing every plain tile — but a contractor who tells you it is required is overstating.
How a roof is fixed is not a matter of habit. It is a calculation specific to your address, based on distance from the sea, altitude, terrain and topography, the height and dimensions of the building, the roof pitch, and the tested resistance of the particular tile. BS 5534 works alongside the Eurocode wind loading standard to arrive at it.
Tile manufacturers produce these specifications, and they produce them free. A competent roofer obtains one for your roof in minutes.
Clay tiles are made to BS EN 1304:2013 and concrete tiles to BS EN 490:2011+A1:2017. Unlike natural slate, which carries a letter grading, tiles declare performance values on a manufacturer's declaration of performance — and those are what you can ask to see.
Concrete tiles declare an equivalent set under BS EN 490, tested to BS EN 491. (490 is the product specification and 491 the test methods; the two are swapped constantly, including in trade literature.)
| Concrete interlocking | Clay interlocking | Plain tile | |
|---|---|---|---|
| Material cost | Lowest | Higher | Highest in clay |
| Units per m² | Fewest | Few | Many |
| Labour | Lowest | Low | Highest |
| Colour in 25 years | Weathers to grey | Holds | Holds in clay |
| Weight | Heaviest | Moderate | Moderate to heavy |
| Minimum pitch | Lowest | Low | High |
| Fixing baseline | Every tile | Every tile | Every fifth course plus perimeters |
Every tile has a minimum pitch, set by both the standard and the manufacturer. The actual figure for a specific product comes from the manufacturer's testing, and for a purpose-designed low-pitch tile it can be a good deal lower than the generic minimum.
The relationship with headlap is inverse: the lower the pitch, the greater the headlap has to be. Exposure increases the required headlap independently of pitch.
That matters commercially as well as technically. More headlap means more tiles per square metre. Less headlap means fewer — which is a quiet way of making a quotation cheaper. Ask what pitch your roof is, what headlap the tile is being laid at, and for the manufacturer's data showing that tile approved at that combination.
Roofing battens under BS 5534 must carry indelible marks showing the supplier, a species or origin code, the size, and the words “Graded BS 5534”. That is printed on the timber.
So when your roof is stripped and the new battens are going on, you can walk outside and look at them. Ungraded timber is a common corner-cut and a completely visible one, and this is the easiest quality check available to any homeowner.
Roofing underlays are made to BS EN 13859-1:2014, and BS 5534 adds the installation and performance requirements — including a wind-uplift classification, so manufacturers declare which exposure zones a product suits. There are practical requirements too: laps secured, limited drape between rafters, limited exposure to sunlight before tiling, and a proper eaves detail.
Ask which underlay is specified and what classification it carries for your exposure. Then, while it is going on, look at whether it is dressed into the gutter at the eaves rather than stopping short behind it. That single detail decides whether water reaching the membrane ends up in the gutter or behind it.
Two systems, and they are separate. Planning: a like-for-like re-roof does not materially affect the external appearance of a building, so under section 55 of the Town and Country Planning Act 1990 it is not development at all and needs no permission. A visible change of covering can be a different matter, particularly inside a conservation area.
Building regulations: where more than 50% of the roof's surface area is renewed, or the work forms part of a major renovation, regulation 23 of the Building Regulations 2010 requires the roof to be brought up to current thermal standards so far as that is technically, functionally and economically feasible. A patch repair does not trigger it, and neither does a roof over unheated space such as a detached garage. The work is signed off through building control or by a roofer registered under a competent person scheme, and you should receive a certificate.
We will tell you which tile, at what pitch and headlap, and what the manufacturer specifies for your address.
Complete new roofs, re-roofing and roof replacement across Chester, the Wirral, Deeside and the surrounding areas.
Tell us about the property and the roof, and we will come back to you — usually the same day.
Prefer to talk? Call 07464 259566 · WhatsApp 0044 7464 259566 · Email Evensbuddy@yahoo.com