Wallasey has two quite different roof shapes on it, and the older one — low-pitched, sometimes hidden behind a parapet — is the one that surprises people on a quotation.
There is no typical Wallasey roof. The inter-war suburbs are mostly hipped, which our Wallasey page explains in detail, and the Victorian and Edwardian seaside stock is something else again.
This guide takes the second of those, because it is the one people are least prepared for when the quotation arrives.
A lot of the older property here was built in classical and Italianate styles, and those styles treat the roof as something to be concealed rather than displayed. The published appraisal for the Wellington Road conservation area describes exactly this: roofs of relatively low pitch, occasionally behind a parapet, in contrast to the steeply pitched Gothic-influenced buildings nearby.
Two features follow from that, and both have consequences for a price.
Every covering has a minimum pitch below which it is not warranted, because at a shallow angle wind-driven rain is pushed back up under the lap faster than the covering can shed it. On a low-pitched roof:
Where the roof sits behind a parapet wall, the water is collected in a lined gutter running along the back of that wall to an outlet, rather than dropping off an eaves into a hanging gutter.
These work well and last a long time when they are properly formed. They are also, when they fail, the most damaging thing on the building — because the water has nowhere to go but inwards, into the wall head and the roof structure.
None of this appears on a standard roofing quotation unless it is asked about. If your building has a parapet, get the gutter lining itemised separately — renewed, or inspected and left, but stated either way.
The older stock here carries a lot of chimney, and it is often decorative. The Wellington Road appraisal describes brick stacks with two or three corbelled courses and terracotta pots, and at Redcliffe stone stacks with extended shafts, set in clusters so that they read as a significant feature of the building.
Every stack is a junction. Each one needs a front apron, soakers interleaved with the courses up both sides, step flashings cut into the mortar joints, and a back gutter behind. That is slow, skilled lead work, and a building with clustered stacks has a great deal of it.
The corbelling matters too: repointing a corbelled stack is more work than repointing a plain one, and the projecting courses are where frost damage concentrates. Get it priced while the scaffold is up, because it is expensive to return for.
Two separate systems. Planning: a like-for-like re-roof does not materially affect the external appearance of a building, so under section 55 of the Town and Country Planning Act 1990 it is not development at all and needs no permission. A visible change of covering can be a different matter, particularly inside a conservation area, where the test is applied more tightly.
Building regulations: where more than 50% of the roof's surface area is renewed, or the work forms part of a major renovation, regulation 23 of the Building Regulations 2010 requires the roof to be brought up to current thermal standards so far as that is technically, functionally and economically feasible — 0.16 W/(m²K) for a roof in an existing dwelling. A patch repair does not trigger it, and neither does a roof over unheated space such as a detached garage.
A survey of the roof and the loft, and a written quotation with the scope set out properly.
New roof installations in Wallasey →
All new roof guides →
New Roof Installations Chester →
Complete new roofs, re-roofing and roof replacement across Chester, the Wirral, Deeside and the surrounding areas.